Start with the asset and its location. State whether the work concerns new fabrication, construction, equipment in operation or a repair. Include equipment identifiers and the planned inspection dates so the team can understand the assignment.
Share the specifications, drawings and inspection requirements available to you. Identify any required witness or hold points, the expected report format and the party receiving the results. Explain site access arrangements and operating conditions that may affect the work.
Ask the proposal to identify the responsible delivery entity, agreed methods, exclusions and required documentation. Where an accreditation or authorization is needed, request the relevant scope. Review these points before scheduling: a clear brief makes technical review and coordination more effective.